Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Abdul Nabi, M and El-adaway, I H (2022) A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Ahmad, R, Nauman, S and Malik, S Z (2022) Tyrannical Leader, Machiavellian Follower, Work Withdrawal, and Task Performance: Missing Links in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) Quantification of the State of Practice of Offsite Construction and Related Technologies: Current Trends and Future Prospects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) The Impact of Offsite Construction on the Workforce: Required Skillset and Prioritization of Training Needs. Journal of Construction Engineering and Management, 148(07).

Brandalise, F M P, Formoso, C T and Viana, D D (2022) Development of a Typology for Understanding Visual Management Concepts and Their Relationships. Journal of Construction Engineering and Management, 148(07).

Chen, L, Zhang, J and Peng, W (2022) Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program. Journal of Construction Engineering and Management, 148(07).

Jayaraj, S, Doerfel, M L and Williams, T (2022) Clique to Win: Impact of Cliques, Competition, and Resources on Team Performance. Journal of Construction Engineering and Management, 148(07).

Khan, M, Khalid, R, Anjum, S, Tran, S V and Park, C (2022) Fall Prevention from Scaffolding Using Computer Vision and IoT-Based Monitoring. Journal of Construction Engineering and Management, 148(07).

Kim, S, Hwang, S and Son, J (2022) Safety Management Guidelines for Precast Concrete Production Plants Using Importance-Performance Analysis. Journal of Construction Engineering and Management, 148(07).

Li, Y and Ning, Y (2022) Mitigating Opportunistic Behaviors in Consulting Projects: Evidence from the Outsourced Architectural and Engineering Design. Journal of Construction Engineering and Management, 148(07).

Li, Y, Soomro, M A, Khan, A N, Han, Y and Xue, R (2022) Impact of Ethical Leadership on Employee Turnover Intentions in the Construction Industry. Journal of Construction Engineering and Management, 148(07).

Li, Y, Wang, J, Cao, L, Wei, D and Wang, Y (2022) Three-Step Mathematical Model for Optimizing Rebar Cutting-Stock with Practical Application. Journal of Construction Engineering and Management, 148(07).

Mahmoud, S, Hussein, M, Zayed, T and Fahmy, M (2022) Multiobjective Optimization Model for the Life Cycle Cost-Sustainability Trade-Off Problem of Building Upgrading Using a Generic Sustainability Assessment Tool. Journal of Construction Engineering and Management, 148(07).

Martínez Fernández, P, Villalba Sanchís, I, Insa Franco, R and Yepes, V (2022) Slab Track Optimization Using Metamodels to Improve Rail Construction Sustainability. Journal of Construction Engineering and Management, 148(07).

Mucheti, A S and Albuquerque, P J R d (2022) Influence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas. Journal of Construction Engineering and Management, 148(07).

Shi, M, Wang, J, Li, Q, Cui, B, Guan, S and Zeng, T (2022) Accelerated Earth-Rockfill Dam Compaction by Collaborative Operation of Unmanned Roller Fleet. Journal of Construction Engineering and Management, 148(07).

Shi, Q, Chen, X, Xiao, C and Han, Y (2022) Network Perspective in Megaproject Management: A Systematic Review. Journal of Construction Engineering and Management, 148(07).

  • Type: Journal Article
  • Keywords: Network perspective; Project network; Network governance; Systematic review; Megaproject management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002304
  • Abstract:
    Megaproject management has continuously faced new challenges that require new theories and methods. The network perspective has been an increasing trend in this context. However, there is a lack of consensus concerning the applicability of network thinking to megaprojects and the status of network analytic methods with respect to the facilitation of megaproject management. This paper aims to present the full status of the network perspective in the context of megaproject management, integrate network thinking, clarify the application of network analytic methods, and accelerate the network paradigm in the context of megaproject management. This research included a systematic review using the Preferred Reporting Items for Systematic Review and Meta-Analyses framework. A total of 152 relevant studies were retrieved from three major databases and reviewed. The findings of this study were based on a novel integrated framework that included the constitutive and the analytic perspectives of the network paradigm. The constitutive perspective sheds light on the megaproject network, its definition, characteristics pertaining to network thinking, and megaproject governance through network logic. The analytic perspective illuminates the applicability of network methods to megaproject issues in detailed subknowledge areas, including stakeholder management, risk management, communication, coordination and collaboration, knowledge management, and interface management. Furthermore, these two perspectives were generalized and converged into pure categories of network research, including network mechanisms and antecedents, network patterns and dynamics, network functions and outcomes, and network controls and optimization. Based on meticulous discussions concerning the integrated framework, limitations and future directions for progress in this area were proposed to facilitate a deeper exchange of ideas in the context of any future research efforts.

Spearing, L A, Bakchan, A, Hamlet, L C, Stephens, K K, Kaminsky, J A and Faust, K M (2022) Comparing Qualitative Analysis Techniques for Construction Engineering and Management Research: The Case of Arctic Water Infrastructure. Journal of Construction Engineering and Management, 148(07).

Wang, X, Arditi, D and Ye, K (2022) Coupling Effects of Economic, Industrial, and Geographical Factors on Collusive Bidding Decisions. Journal of Construction Engineering and Management, 148(07).

Xiao, B, Wang, Y and Kang, S (2022) Deep Learning Image Captioning in Construction Management: A Feasibility Study. Journal of Construction Engineering and Management, 148(07).

Zhang, M and Ge, S (2022) Vision and Trajectory–Based Dynamic Collision Prewarning Mechanism for Tower Cranes. Journal of Construction Engineering and Management, 148(07).

Zhou, T, Zhu, Q, Shi, Y and Du, J (2022) Construction Robot Teleoperation Safeguard Based on Real-Time Human Hand Motion Prediction. Journal of Construction Engineering and Management, 148(07).